We had another case of Liro contacting a member of LB Rising accusing their architect of fraud by intentionally overdesigning a foundation for the sole purpose of increasing the design fee. "This is the reason for the new elevation requirements" the member was told. We have been hearing this from Liro inspectors and from design professionals and now we have someone in the QA department actually saying it.
NY Rising’s premier construction contractor, The Liro Group, is blaming the recent design changes that weaken our homes on designers committing fraud by following the published rules for elevation. So of course, the way to fix this is to stop the recovery, require all the submitted plans to be redesigned to remove the walls, slab, flood vents and design to code minimum in the hopes that the design fee would be reduced. The plan to save money on design fees is to force designers to use an open foundation that Liro hopes will be cheaper. The open design has never been shown to be cheaper, it has no place in most of our communities and no place in 11 degree weather. If the homeowner and the designer feel that an open foundation is appropriate then they need to make that decision NOT a NY Rising contractor.
NY Rising created these rules and instead of fixing the alleged problem they make changes to design criteria that will impact the appearance, charm and character of our neighborhoods for decades to come instead of dealing with the problem head on. Once again the victim is being accused of being the problem by hiring architects that followed the published rules.
This is another case of a NY Rising failure that stops our recovery and drives families away.
Thursday, January 8, 2015
Subscribe to:
Posts (Atom)